Heavy Duty Lifting in the Pile Yard: Why Chain Slings Are Being Retired (2026)
A 12 m steel formwork set weighs 3.5–5.5 t, comes out of the curing chamber at 60–80 °C, and gets lifted four times per cycle — which makes heavy duty lifting the largest safety exposure in a precast









