These jobs used to be done by hand and by scaffold. Machines do them now, but tonnage alone is a poor way to choose. For short transfers inside a plant, a Truck mounted crane is the easier call, it arrives ready to lift and needs no trailer, which helps when loading points move through the day. Where the ground is open and can take the load, a Rough Terrain Crane covers most of a site from one position. For utility work that puts people and tools up at height, an Aerial work platform saves the back and forth of lifting.
The real difficulty sits at the handover. A Truck crane unloads outside the gate, and the route inside has to be picked up by something smaller. When that link fails, material sits at the gate and the crews either side of it wait together. Walk the route before the day starts; where a corner will not take the machine and where the ground is too soft are easier to see on site than on a drawing.
Support equipment shifts with it as well. Loose material, attachments and spares tend to move on a wheel loader, which carries them to the work face in one pass so the spider unit does not have to reposition for each load. Split the roles clearly and the rework on site drops by half.
There is no standard answer for this kind of job. Read the gate width, the slope and the bearing capacity first, then decide what goes in, because in the wrong order even an expensive machine stays on the truck.