How to Structure a 200-Metre Trial Order for Percussion Tooling (2026 Template)

How to Structure a 200-Metre Trial Order for Percussion Tooling (2026 Template)

A valid trial is one rig, one rock type, one agreed acceptance number and a written scope letter — not a free sample drilled in easy ground. If you are qualifying Round Extension Drill Rods for a production fleet, 50 metres will not expose a heat-treatment problem that appears at 400 metres, while a full campaign is too expensive to waste on an unproven supplier. As a China manufacturer, Tuoyan recommends a bounded 50–200 metre trial with a fixed baseline and daily logging. The trial exists to remove the supplier's home advantage — soft rock, short holes, ideal water supply — while the order value is still small. Below is the scope letter, the measurement sheet and the acceptance rule.

Figures here are illustrative industry benchmarks from published field and procurement guidance, not a performance promise. Set your own numbers against your rig, geology and current baseline.

 


 

1. What must the trial scope letter fix before the first hole?

Fix six variables in writing, and agree who pays for freight before anything ships. Ambiguity is what turns a failed trial into an argument. State hole diameter, depth, total drilled metres, rock type with UCS or abrasivity, rig and drifter model, and the acceptance criteria. Specify that the Coupling Sleeve used in the trial comes from a single identified lot, and that no component is swapped mid-trial without a written note. If a supplier proposes a demonstration at its own site on easier ground, decline or require comparable UCS and CERCHAR abrasivity.

Variable Write down in the scope letter Why it matters Illustrative target
Trial length Total drilled metres and number of holes Short trials hide fatigue issues 50–200 m, one full campaign
Geology UCS range, abrasivity index, water conditions Harder rock compresses all lifespans Match your production face
Equipment Rig, drifter, feed and rotation settings A different rig changes the whole result One rig, one operator crew
Components Part numbers, lot IDs, spare count Mixing lots destroys the comparison One lot, 3–5 spare bits
Measurements What is logged and by whom Memory fades, weekly logs mislead Daily, per shift
Commercials Freight, failure ownership, credit terms Prevents a dispute after a bad result Agreed before shipment

Also agree what happens if the string fails early: who keeps the failed pieces, who pays return freight, and whether the buyer receives a replacement or a credit. A supplier confident in its process will accept those clauses. Tuoyan regards a trial order as a normal step for a new OEM or ODM programme, and would rather sign a precise scope than negotiate after the fact. Keep the trial to consumables plus one string, not a fleet.

✅ Bottom line: Lock six variables and the failure ownership into a signed scope letter; a trial without acceptance criteria is a paid demonstration.

 


 

2. Which measurements turn a trial into an acceptance decision?

Log five numbers daily and compare each against your current baseline, not against the supplier's brochure. Penetration rate in metres per hour, mechanical availability, consumable life in drilled metres, thread and joint condition every 100 metres, and every failure mode with its location. A 15% faster penetration rate means little if the rig stops twice per shift; mean time between failures is the decision metric. Record the rock conditions on the same sheet, because a hard day can look like a bad batch.

Metric Baseline Acceptance rule (agree in advance) Illustrative industry reference
Penetration rate Your current m/h Within an agreed band, not a peak value Compare per shift, same face
Mechanical availability Your current percentage No downward trend over the trial ≥90% is a common target
Consumable life Metres per bar and per joint Meet or beat baseline by an agreed margin Bars often quoted 1,000–3,000 m
Joint condition Photos at 0 m No visible galling or flank deformation Check every 100 m
Failure record Category and drilled metres No repeated structural failures Structural vs wear vs handling

Keep the control group honest. Shallow-hole Tapered Drilling Tools should not be used as the benchmark for a deep-hole hydraulic string, because the friction-fit interface and the threaded interface carry different loads. Conversely, do not judge a light pneumatic assembly by a production-bench target. Luoyang Tuoyan Machinery Equipment Co., Ltd. builds both families at its Yiyang County plant, and the engineering advice is to compare like with like: same hole range, same depth, same energy class.

Plan the calendar as well. Published lead-time practice and the site's own trade terms show a one-month peak season and roughly 15 working days off season, so a trial that ends the week before peak season leaves no time for a production order. Tuoyan suggests scheduling the trial in the off-season window and placing the bulk PO with FOB, CFR, CIF or EXW terms agreed up front.

✅ Bottom line: Accept or reject on five logged metrics versus your own baseline, with joint photos every 100 metres and no mid-trial component swaps.

 

FAQ

Q: Is 200 metres enough to judge a whole tooling system? A: Enough to screen a supplier, not to certify a lifetime. It reveals early wear, galling, marking errors and gross heat-treatment faults. Extend the run or repeat it on a second face if you need fatigue-life data.

Q: Who should pay for a trial that fails? A: Decide in the scope letter. Common practice is that the buyer pays freight on a genuine trial and the supplier credits confirmed manufacturing defects, with each side keeping its own test records. Put the wording in the PO.

Q: Can we run the trial on our existing mixed-brand string? A: Avoid it. Mixed components make responsibility impossible to assign. Use one supplier's lot for the trial and keep the old string as the baseline on a separate rig.

 

Get a trial scope letter you can sign

Tell us your hole diameter, depth, rock strength and rig model, and whether you need Fully carburized taper drill rods or threaded bars for the run. Tuoyan will draft a one-page scope letter, a daily log sheet and an acceptance table with the values left blank for your baseline. As a manufacturer with OEM services, the Tuoyan team can supply a small trial lot with lot-coded marking and T/T or L/C terms. Request current certificates and verify number, scope, issuing body, expiry date, report version and the covered production lot before shipment. No obligation, no fleet commitment.

Mobile: +86 18939018277
Email: [email protected]
Website: www.tuoyandrill.com

hard-rock-taper-drill-rod